Cape Coral Yacht Club Renovation

Wright Construction is providing Design-Build services for the new City Garage and Public Works Offices. This new construction project is located adjacent to the Sebastian Municipal Airport. One section of the building will be primarily offices, classrooms, locker rooms, offices, a receptionist/lobby area, restrooms, maintenance storage areas, and mechanical/ electrical rooms. The second section or “wing” of the building will consist of open garage bays, an enclosed bay vehicle, and equipment maintenance area, the fleet maintenance supervisor’s office, additional offices, a sign shop, tire storage, welding room, vehicle shop, and an equipment area with lifts. Extensive infrastructure and site work will be required with detention basins, parking lots, fueling stations, vehicle wash areas, roadways, and off-site utility construction.

This building is a pre-engineered metal building with a standing seam roof and insulated wall panels for energy efficiency. The overall design incorporates CMU construction around the perimeter while also being aesthetically pleasing to the eye. The back-of-house areas will be secured from the public by automatic gates and card readers. Concrete will be utilized primarily on the site due to the size and weight of the fleet vehicles. Asphalt will be utilized for the employee and public parking areas. Finally, electric vehicle charging stations will be incorporated into the project.