FSW Building H

Construction Management Services were provided for the replacement of the air conditioning system with Penthouse Air Conditioning. Building upgrades included new HVAC, re-roof, new windows on 1st floor and new lighting and electrical switch gear. The Science Laboratory /Classrooms was relocated from the first to the second floor with restrictive site access and staging for student and faculty safety. Building H was located between two active campus classroom buildings: I and G. Elevator and ADA access had to be maintained throughout the construction process. The project was phased one floor at a time in order to maintain the regular classroom schedule for students.