McGregor Boulevard

McGregor Blvd’s drainage and roadway needed to be replaced within a residential area. The project included replacement of asphalt, curbs, concrete sidewalks, mailboxes, brick pavers, signage and pavement markings, drive-ways, turf, and existing decorative royal palm trees. Asphalt was milled and resurfaced and storm sewer piping was replaced.